Citizen Reporting
Reporting Guidelines
Everything you need to know to submit accurate, verifiable infrastructure reports. Following these guidelines ensures your report moves quickly through the verification pipeline.
Condition Level Quick Reference
0
Absent
Asset does not exist or is rubble
1
Critical
Completely non-functional, immediate danger
2
Poor
Partially functional, major defects
3
Fair
Functional but needs repair
4
Good
Functional, minor issues only
5
Excellent
New or fully renovated
- Minimum 2 photos per report — one wide shot showing the full asset, one close-up showing the specific damage or absence.
- Include at least one photo with a visible landmark, street sign, or known building for location verification.
- Photos must be taken within 30 days of submission. Date-stamped photos are preferred.
- Ensure good lighting. Blurry, dark, or unclear photos will result in the report being returned.
- Do not use stock images, screenshots, or photos downloaded from the internet.
- Maximum 10 photos per report. JPG or PNG format only, each under 5MB.
Ready to submit a report?
Make sure you have clear photos, a specific description, and the correct location details before you begin.
Submit a Report